A punch list is the list of small things that need fixing before or right after you close on a new home: paint touch-ups, a door that rubs, a missing outlet cover, a scratch in a countertop.
Almost every new home has one. The difference between a punch list that gets done and one that gets forgotten is how it’s built.
When to make it
- At the builder’s orientation walkthrough, usually shortly before closing
- Ideally after an independent final inspection, so your inspector’s findings are included
- Again before your builder warranty period ends, for anything that shows up after you move in
How to build it
1. Go room by room, in order
Start at the front door and work through the house the same way every time. For each room, check:
- Walls and ceilings: paint, nail pops, drywall seams
- Floors: scratches, gaps, squeaks, uneven transitions
- Doors: swing, latch, gaps, hardware
- Windows: open, close, lock, screens, seals
- Cabinets and counters: alignment, chips, scratches, soft-close hardware
- Outlets and switches: all working, covers on, GFCIs in wet areas
- Plumbing: faucets, toilets, drains, no leaks under sinks
- Trim and caulk: gaps, missing pieces
Then the outside: siding, gutters, grading, driveway, landscaping.
2. Photograph every item
Take a photo of each issue, and include something for scale. Number the photos to match the list.
3. Write each item clearly
Each line should say where, what and what you expect:
Primary bath, left sink: cabinet door rubs frame. Adjust so it closes freely.
Vague items like “paint needs work” get vague results.
4. Agree on dates
For each item, ask the builder’s representative:
- Who will fix it?
- By when? Before closing, or within a set number of days after?
Write the date next to the item.
5. Get it in writing, and keep a copy
Send the list to the builder by email, with photos attached, and keep the reply. If items are to be finished after closing, ask that the commitment be in writing.
After you move in
Keep a running list of anything new: a crack in drywall, a door that starts sticking as the house settles, a leak under a sink. Submit it through the builder’s warranty process, following their rules for how and when to file.
Don’t wait until the last week of your warranty period. Builders are busier near deadlines, and some items take more than one visit.
What it changes
A clear, photographed, dated punch list turns “we’ll get to it” into a schedule. It also creates a record if something isn’t fixed.